You are here : Home    project    Oil-Gas-Process Industry & Subsea Projects

Oil-Gas-Process Industry & Subsea Projects

 

Year / Location

Project Type

Project Details

Aug-19 B.T. Vent Door Design
  • Design of B.T. Vent Door
  • Bill of Material
Jul-19 Structural Analysis of E- House
  • Structural Analysis of E-Houses
  • Air Cooling Calculation for E-House
  • Illuminance Calculations for E-House
Jul-19 BW ODIN GA update for Scrubber
  • GA Update showing Scrubber & Panama Modification Mooring fittings
Jun-19 Spool Lifting Analysis for 18" Tie in spool lift analysis (2 nos),
  • Preparation of Spool Lifting analysis 18" spool at HAS Platform at Tie in point 1
  • Preparation of Spool Lifting analysis 18" spool at HAS Platform at Tie in point 2
Jun-19 Spool Lifting Analysis for 14" Tie in spool lift analysis (2 nos),
  • Preparation of Spool Lifting analysis 14" spool at HAS Platform at Tie in point 1
  • Preparation of Spool Lifting analysis 14" spool at HAS Platform at Tie in point 2
May-19 Lifting Analysis of Protection Cage for 10" B-147A
  • Lifting Analysis of Protection cage for 10" B-147A to tie-in at hot tap
  • Preparation of Lifting Analysis report.
  • Preparation of Rigging Drawing.
May-19 Crane chart & Lifting plan for Hot Tap Cage Protector for MV Seamec
  • Crane chart for MV Seamec Princess cranes from crane rating sheet.
  • Lifting plan using the MV Seamec Princess crane for "hot tap cage protector"
Apr-19 NP Bangprakong Ship's stability
  • Software for Intact stability, Damage stability and Longitudinal strength modules of Stability Instrument for the subject vessel
Mar-19 Design & calculation of additional funnel structure
  • Design and calculation of additional funnel structure.
Feb-19 Feasibility of Dulam Aureus to carry out subsea installation operations
  • Study of the regulatory and technical compliance of vessel to carry out required operations
  • Equipment [Crane] – study of outreach to install structure at locations and lifting capacity to support the payload
  • Structure [Deck Strength] – study of load bearing capacity of the cargo deck to support the maximum weight of payload
  • Stability [Heel/Trim] – anti rolling check of vessel during crane operation using the load cases defined in stability booklet.
Feb-19 Mooring Fittings Upgrade for Gaia Celeris
  • Mooring Fittings Upgrade for M.V. Gaia Celeris as Per Pilbara Ports Authority (PPA)
  • Updated General Arrangement drawing for PPA's Ship Towing
  • Updated Mooring Arrangement drawing for PPA's Ship Towing (SWL 125 tons)
  • Underdeck Stiffening drawings for New Mooring Fittings
  • Bill of Material for underdeck Stiffening.
  • Strength calculation of underdeck reinforcement for New Mooring Fittings
Feb-19 Tandem Crane Lift Analysis For Subsea Spool (12"WF NLM-12 TO NLG @ NLM-12)
  • Drawing Preparation of Rigging Arrangement and Analysis of 1 spool based on lifting analysis, 12" - NLM12, Tandem Lift
  • Preparation of Lifting Analysis & Lifting Arrangement Report
Feb-19 Tandem Crane Lift Analysis For Subsea Spool (12" WF NLM-13 to NLG @ NLM-13)
  • Drawing Preparation of Rigging Arrangement and Analysis of 1 spool based on lifting analysis (NLM-13 to NLG at NLM-13)
  • Preparation of Lifting Analysis & Lifting Arrangement Report
Feb-19 Pilot Shelter & General Arrangement Preparation for Panama Canal Transit for the vessel 'Japin Arrow'.
  • Pilot Shelter Detail
  • General Arrangement showing the position of pilot shelter with the pilot ladder arrangement
Feb-19 Lifting Analysis of Hot Tap Equipment
  • Preparation of Lifting Analysis report as per provided rigging arrangement
Jan-19 Pre-bid engineering, MTO and Equipment Details for SCI Nalanda
  • Pre bid engineering study for conversion of PSV Nalanda from ERRV Group (C) to ERRV Group (B) Compliance.
  • Estimation of major equipment and materials requirements.
Nov-18 Survey of under construction Jack up Barge
  • Survey of under construction Jack Up Barge to ascertain percentage and quality of work done.
2018-India Vessel Compliance Survey
  • Compliance survey of vessel to meet technical specifications
2018-India Structure Repair Plan for "BW Birch"
  • Side shell & webs were damage due to collision with jetty, structure repair plan was prepared as per IACS standard.
2018-India Preparation of Crack Repair Plan for "BW Loyalty"
  • Cracks were observed on web frame 35, repair plan was prepared.
2018-India Prewash by Vent – calculations + P&A Manual Addendum
  • Prewash calculations by forced air ventilation for noxious cargo tanker & addendum to P&A manual
2018-India Prewash by Vent – calculations
  • Prewash calculations by forced air ventilation for noxious cargo tanker
2018-India Actinia – Roughneck Support design & BOP Bonnet lifting frame design
  • Design of BOP bonnet handling system foundation frame.
  • Analysis & design of roughneck support structure
2018-India DFCC 15B Narmada – Truss installation
  • Design of A-frame and lifting barge for installation of bridge span across Narmada River.
2018-India – Ongoing Detailed engineering of FPSO – Marine
  • Structural modelling of existing tanker
  • Structural modelling of modifications to suit FPSO service
  • Design and Modelling for Piping / HVAC / Piping support
  • Detailed engineering for Electrical and instrumentation – IO List, instrument index, block diagrams, cable tray layouts, etc.
  • Detailed engineering for material handling
  • Equipment data review
  • Process safety
  • Basic design of major structural outfits – helideck, crane, foundations of offloading hose reel, and various miscellaneous equipment
  • General arrangements and isometrics
2018-India Analysis and Preparation of Docking Plan
  • Preparation of Docking Plan
  • Technical liaising with Class for approval
2017-India Renewal of various steel structures of the Rig Actinia
  • Renewal of various steel structures of the Rig Actinia
2017-India Preparation of Loadout and transportation plans
  • Preparation of 2D drawings for transportation of various cargoes
  • Lashing and loadout calculations
2017-India Conversion of an LPG Tanker to FSU
  • Design & analysis of mooring system to meet operating and survival conditions
  • Structural Analysis and design of under deck strengthening for chain stoppers
  • Preparation of under deck strengthening drawings for chain stopper
  • CAPEX study for complete conversion
  • Study of site data
  • Technical liaisoning with Class
2017-India Spool Lifting Analysis
  • Modeling of Beam Elements, rigid connections and support constraints, spring elements etc.
  • DNV code, Marine Operations part 2, Chapter 5 Lifting.
  • Preparation of lifting arrangement drawings.
2017-India Feasibility Study for new crane Installation & old crane relocation
  • Feasibility Study for 60 Tons crane Installation
  • Feasibility Study for 8 Tons crane relocation
  • Feasibility for 10 Tons crane installation
  • Stability analysis with new crane arrangements
2017-India 30 Tons Crane installation
  • Preparation of Crane pedestal foundation dwgs
  • Structural strength analysis iwo crane installation
  • Preparation of Structural modification plan
  • Stability Analysis
  • On site Inclining experiment
2017-India Strengthening and Analysis to avoid crop and renewal
  • Digitization of existing drawings
  • Structural analysis of area of concern for crop and renewal
  • Preparation of strengthening drawings and analysis report
2017-India Installation of eight men accommodation container
  • Digitization of existing drawings
  • Structural analysis of under deck container footings
  • Preparation of strengthening drawings
2017-India Engineering Analysis of Helideck Support Connection Renewal
  • Structural analysis of Helideck
  • Renewal methodology
2017-India Sand Trap Support Design and Analysis
  • Structural analysis of sand trap support structure
  • Renewal methodology
2017-India Swing Platform Design Drawing and Analysis
  • Design and analysis of swing platforms
2017-India Engineering Analysis of All Windlass Foundation Renewal
  • Structural analysis of windlass foundation
  • Renewal methodology
2017-India Sewage Tank Drawing and Design
  • Design and preparation of fabrication drawing for sewage tank
2017-India Column Shell Renewal Study
  • First principle analysis to renew the corroded part of column shell to meet ABS recommendation
2017-India Drawing and Analysis of Installation of AC Unit
  • Installation of AC unit to augment the existing AC system
  • Preparation of structural and piping drawings
2017-India Drawing of Bomb Shelter at Drill Floor
  • Design of bomb shelters for drill floor
2017-India Tugger Base Design and Drawing
  • Design of base platform for tugger winches to assist handling of drill strand
2017-India Mooring Analysisar of Rig Actinia
  • Eight point mooring analysis of rig actinia at 35m water depth for operating and survival condition
2017-India Mooring Analysis of Bunker Tanker
  • Mooring analysis of bunker tanker to single buoy system
  • Design of gravity anchors
2016-India Mooring Analysis
  • Mooring analysis of vessel “Kreuz Supporter” for operating and survival condition in Mumbai high oil field
  • Catenary plots for understanding the vertical clearances from subsea pipelines
2016-India Mooring Analysis
  • Mooring analysis of vessel “Kreuz Supporter” for operating and survival condition in Tapti oil field
  • Catenary plots for understanding the vertical clearances from subsea pipelines
2016-India Ugradation of Crane capacity
  • Under deck strengthening assessment for higher capacity, proposal of suitable additional strengthening
  • Analysis of crane knuckle boom for higher capacity
2016-India Heavy Lift Analysis
  • Installation drawings for 150 t crane
  • Structural assessment
  • Stability assessment
2016-India DSV notation for Indian flag
  • Preparation of statutory layouts
  • Preparation of system layouts
2016-India Installation of heating Coils
  • Preparation of system drawing
  • Heat calculation
  • Layout drawings

2015-India

DP capability Plot

  • Preparation of Dp capability plot and thrust Utilisation curves
  • Evaluation under operating and survival condition

2015-India Ongoing

Peer Review of Mooring Analysis report.

  • Peer Review of Mooring Analysis report for accommodation barge.
  • Review of Analysis methodology, system particulars, met-ocean data etc.
  • Field layout review,
  • Review of analysis results against design criteria (acceptance criteria) based on expertise and detailed mooring analysis (if required).
  • Issue of recommendations.

2014 – India – Ongoing

Design and Installation of lifting beams on Semi Submersible- Actinia

  • Preparation of Structural Drawing
  • Structural Calculation

2014-India Ongoing

Review of Baseline Platform Inspection Report (BPI) & Marine Growth Review (MGR) Report

  • Review of BPI-MGR report for recertification of jacket platform
  • Review of previous certification recommendation and outstanding activities
  • Review of periodic inspection, damages reported and remedial works completed
  • Assessment of the condition of the Jacket structure with respect to the as-built data
  • Issue of recommendations

2013 Abu Dhabi

BUNDUQ HSE Management System Manual update

  • Assisting DNV for BUNDUQ’s HSE Management System Manual update

2013 Abu Dhabi

OOCEP Corporate HSE Training Procedure

  • Assisting DNV for preparing OOCEP’s Corporate HSE Training Procedure

2013
Abu Dhabi

BUNDUQ HSE Management System Manual update

  • Assisting DNV for BUNDUQ’s HSE Management System Manual update

2013
Abu Dhabi

OOCEP Corporate HSE Training Procedure

  • Assisting DNV for preparing OOCEP’s Corporate HSE Training Procedure

2012-India

Windload Analysis for CPC Zapata

  • Evaluation of windload and wind heeling moment on vessel and crane being carried piggy back
  • Determin critical wind speed and direction to limit operations envelope

2012-Abu Dhabi / India

GASCO ASAB – III, Phase – 3, EIA

  • Assisting DNV for ASAB – III, Phase – 3, Environmental Impacy Analysis (EIA) Study

2012-Abu Dhabi / India

ADCO-TR Full Field Development HSEIA – Phase IV (Decommissioning & Demolition) Study

  • Assisting DNV for ADCO-TR Full Field Development Health, Safety & Environmental Impact Assessment (HSEIA) – Phase IV (Decommissioning & Demolition) Study

2012-Singapore

Hydrodynamic Analysis for 88m PSV

  • Calculation of extreme sea motions at cranes and vessel CG points under sea conditions given by the owners

2012-Singapore

Pre Bid Engineering Assistance for Martin Linge FSO for  Hild Field

  • Engineering assistance for hull structure modification
  • F.E.A. for hull structure
  • Review of hull and marine system drawings

2012-India

Pre Bid Engineering Assistance for Modification to ONGC Oil Rig

  • Engineering assistance for hull structure modification
  • Review of hull and marine system drawings

2011- Singapore

Modification to LNG Vessel Cargo Piping

  • Modification of Piping
  • Design of New Production Manifold
  • HAZOP Study for above modification

2011-Abu Dhabi

ADGDC Drilling Safety Manual

  • Assisting DNV for ADGDC Drilling Safety Manual

2011-Abu Dhabi

ZADCO Incident Reporting & Investigation Procedure

  • Assisting DNV for ZADCO Incident Reporting & Investigation Procedure

2011-Singapore

Sea keeping and hydrodynamic analysis of offshore vessel

  • Calculation of extreme sea motions at cranes and vessel CG points under sea conditions given by the owners

2011-Singapore

Gob Eye structure design

  • Finite element analysis of gob eye structure

2010-Oman

Petroleum Development Oman (PDO) - Asset Integrity Process Safety Management Assessment

  • Assisting DNV for preparation of PDO Asset Integrity Process Safety Management Assessmentfor onshore drilling operations.

2010-Singapore

Structural analysis for Cattle carrier generator installation

  • Finite element analysis
  • Strength and vibration calculation
  • Generator room design

2010-Singapore

FPSO Marine Systems

  • Engineering and Drawing for De-commissioning FPSO systems.

2009-Singapore

Helideck Design Analysis

  • Engineering and Structural Analysis for Helideck retrofit on an oil platform

2009-Singapore

Fitment of Gondola, transducers and trolley and Moon Pool

  • Engineering and structural analysis for Fitment of Gondola, transducers, trolley and Moon Pool on board seismic survey vessel

2008-Singapore

Global FEA for FPSO,  Design of module Stool Supports and Crane Pedestal with Boom Rest

Global 3-D Finite Element Analysis

  • Dynamic loads
  • Internal loads for cargo conditions
  • Turret mooring reactions
  • Turret loads on deck

Deflections and stresses for:

  • Helideck
  • Flare Tower
  • Topside stools
  • Coarse & Fine Mesh Modeling
  • Crane Pedestal with Boom Rest

2007-Singapore

Vibration Analysis for TG Foundation

  • Structural design of the Turbine Alternator    Foundation
  • Static analysis of the deck structure
  • Evaluation the natural frequency of the engine room deck structure
  • Vibration study and the foundation drawing

2007-Singapore

Preliminary Mooring Analysis

  • 8 point spread moored system
  • Dynamic spread moorings analysis according to class requirement including intact, damage and transient cases.
  • Simulated load results.
  • Mooring pattern
  • Cantenary plot
  • Motion envelopes
  • Anchor type evaluations

2007-Singapore

Hydrodynamic design for FSO

  • Green water analysis
  • Slamming analysis
  • Air gap analysis for external turret

 

2006-Singapore

Upgrade design and systems engineering
(1 x FPSO 59,650 tdw)

  • Location analysis / spread mooring analysis
  • Offloading analysis
  • Hull analysis
  • Evaluation of marine systems

2006-Singapore

Steel renewal
(1 x FPSO 59,650 tdw)

  • Shipyard supervision of steel renewal

2006-Singapore / Malaysia

Conversion of 1 x chemical tanker to FPSO

  • Complete preliminary design and engineering for bid process
  • Hull evaluation for ultimate limit states

2006 - Singapore / Malaysia

Conversion of 2 Panamax hulls to FPSOs

  • Complete preliminary design and engineering for bid process
  • Hull evaluation for ultimate limit states
  • Systems engineering and integration of process plant and topsides
  • Preparation of tender documents for submission

2006-Singapore / Malaysia

Conversion of Suezmax tanker to FPSO

  • Complete preliminary design and engineering for bid process
  • Hull evaluation for ultimate limit states
  • Systems engineering and integration of process plant and topsides
  • Preparation of tender documents for submission to oil major.