Aug-19 |
B.T. Vent Door Design |
- Design of B.T. Vent Door
- Bill of Material
|
Jul-19 |
Structural Analysis of E- House |
- Structural Analysis of E-Houses
- Air Cooling Calculation for E-House
- Illuminance Calculations for E-House
|
Jul-19 |
BW ODIN GA update for Scrubber |
- GA Update showing Scrubber & Panama Modification Mooring fittings
|
Jun-19 |
Spool Lifting Analysis for 18" Tie in spool lift analysis (2 nos), |
- Preparation of Spool Lifting analysis 18" spool at HAS Platform at Tie in point 1
- Preparation of Spool Lifting analysis 18" spool at HAS Platform at Tie in point 2
|
Jun-19 |
Spool Lifting Analysis for 14" Tie in spool lift analysis (2 nos), |
- Preparation of Spool Lifting analysis 14" spool at HAS Platform at Tie in point 1
- Preparation of Spool Lifting analysis 14" spool at HAS Platform at Tie in point 2
|
May-19 |
Lifting Analysis of Protection Cage for 10" B-147A |
- Lifting Analysis of Protection cage for 10" B-147A to tie-in at hot tap
- Preparation of Lifting Analysis report.
- Preparation of Rigging Drawing.
|
May-19 |
Crane chart & Lifting plan for Hot Tap Cage Protector for MV Seamec |
- Crane chart for MV Seamec Princess cranes from crane rating sheet.
- Lifting plan using the MV Seamec Princess crane for "hot tap cage protector"
|
Apr-19 |
NP Bangprakong Ship's stability |
- Software for Intact stability, Damage stability and Longitudinal strength modules of Stability Instrument for the subject vessel
|
Mar-19 |
Design & calculation of additional funnel structure |
- Design and calculation of additional funnel structure.
|
Feb-19 |
Feasibility of Dulam Aureus to carry out subsea installation operations |
- Study of the regulatory and technical compliance of vessel to carry out required operations
- Equipment [Crane] – study of outreach to install structure at locations and lifting capacity to support the payload
- Structure [Deck Strength] – study of load bearing capacity of the cargo deck to support the maximum weight of payload
- Stability [Heel/Trim] – anti rolling check of vessel during crane operation using the load cases defined in stability booklet.
|
Feb-19 |
Mooring Fittings Upgrade for Gaia Celeris |
- Mooring Fittings Upgrade for M.V. Gaia Celeris as Per Pilbara Ports Authority (PPA)
- Updated General Arrangement drawing for PPA's Ship Towing
- Updated Mooring Arrangement drawing for PPA's Ship Towing (SWL 125 tons)
- Underdeck Stiffening drawings for New Mooring Fittings
- Bill of Material for underdeck Stiffening.
- Strength calculation of underdeck reinforcement for New Mooring Fittings
|
Feb-19 |
Tandem Crane Lift Analysis For Subsea Spool (12"WF NLM-12 TO NLG @ NLM-12) |
- Drawing Preparation of Rigging Arrangement and Analysis of 1 spool based on lifting analysis, 12" - NLM12, Tandem Lift
- Preparation of Lifting Analysis & Lifting Arrangement Report
|
Feb-19 |
Tandem Crane Lift Analysis For Subsea Spool (12" WF NLM-13 to NLG @ NLM-13) |
- Drawing Preparation of Rigging Arrangement and Analysis of 1 spool based on lifting analysis (NLM-13 to NLG at NLM-13)
- Preparation of Lifting Analysis & Lifting Arrangement Report
|
Feb-19 |
Pilot Shelter & General Arrangement Preparation for Panama Canal Transit for the vessel 'Japin Arrow'. |
- Pilot Shelter Detail
- General Arrangement showing the position of pilot shelter with the pilot ladder arrangement
|
Feb-19 |
Lifting Analysis of Hot Tap Equipment |
- Preparation of Lifting Analysis report as per provided rigging arrangement
|
Jan-19 |
Pre-bid engineering, MTO and Equipment Details for SCI Nalanda |
- Pre bid engineering study for conversion of PSV Nalanda from ERRV Group (C) to ERRV Group (B) Compliance.
- Estimation of major equipment and materials requirements.
|
Nov-18 |
Survey of under construction Jack up Barge |
- Survey of under construction Jack Up Barge to ascertain percentage and quality of work done.
|
2018-India |
Vessel Compliance Survey |
- Compliance survey of vessel to meet technical specifications
|
2018-India |
Structure Repair Plan for "BW Birch" |
- Side shell & webs were damage due to collision with jetty, structure repair plan was prepared as per IACS standard.
|
2018-India |
Preparation of Crack Repair Plan for "BW Loyalty" |
- Cracks were observed on web frame 35, repair plan was prepared.
|
2018-India |
Prewash by Vent – calculations + P&A Manual Addendum |
- Prewash calculations by forced air ventilation for noxious cargo tanker & addendum to P&A manual
|
2018-India |
Prewash by Vent – calculations |
- Prewash calculations by forced air ventilation for noxious cargo tanker
|
2018-India |
Actinia – Roughneck Support design & BOP Bonnet lifting frame design |
- Design of BOP bonnet handling system foundation frame.
- Analysis & design of roughneck support structure
|
2018-India |
DFCC 15B Narmada – Truss installation |
- Design of A-frame and lifting barge for installation of bridge span across Narmada River.
|
2018-India – Ongoing |
Detailed engineering of FPSO – Marine |
- Structural modelling of existing tanker
- Structural modelling of modifications to suit FPSO service
- Design and Modelling for Piping / HVAC / Piping support
- Detailed engineering for Electrical and instrumentation – IO List, instrument index, block diagrams, cable tray layouts, etc.
- Detailed engineering for material handling
- Equipment data review
- Process safety
- Basic design of major structural outfits – helideck, crane, foundations of offloading hose reel, and various miscellaneous equipment
- General arrangements and isometrics
|
2018-India |
Analysis and Preparation of Docking Plan |
- Preparation of Docking Plan
- Technical liaising with Class for approval
|
2017-India |
Renewal of various steel structures of the Rig Actinia |
- Renewal of various steel structures of the Rig Actinia
|
2017-India |
Preparation of Loadout and transportation plans |
- Preparation of 2D drawings for transportation of various cargoes
- Lashing and loadout calculations
|
2017-India |
Conversion of an LPG Tanker to FSU |
- Design & analysis of mooring system to meet operating and survival conditions
- Structural Analysis and design of under deck strengthening for chain stoppers
- Preparation of under deck strengthening drawings for chain stopper
- CAPEX study for complete conversion
- Study of site data
- Technical liaisoning with Class
|
2017-India |
Spool Lifting Analysis |
- Modeling of Beam Elements, rigid connections and support constraints, spring elements etc.
- DNV code, Marine Operations part 2, Chapter 5 Lifting.
- Preparation of lifting arrangement drawings.
|
2017-India |
Feasibility Study for new crane Installation & old crane relocation |
- Feasibility Study for 60 Tons crane Installation
- Feasibility Study for 8 Tons crane relocation
- Feasibility for 10 Tons crane installation
- Stability analysis with new crane arrangements
|
2017-India |
30 Tons Crane installation |
- Preparation of Crane pedestal foundation dwgs
- Structural strength analysis iwo crane installation
- Preparation of Structural modification plan
- Stability Analysis
- On site Inclining experiment
|
2017-India |
Strengthening and Analysis to avoid crop and renewal |
- Digitization of existing drawings
- Structural analysis of area of concern for crop and renewal
- Preparation of strengthening drawings and analysis report
|
2017-India |
Installation of eight men accommodation container |
- Digitization of existing drawings
- Structural analysis of under deck container footings
- Preparation of strengthening drawings
|
2017-India |
Engineering Analysis of Helideck Support Connection Renewal |
- Structural analysis of Helideck
- Renewal methodology
|
2017-India |
Sand Trap Support Design and Analysis |
- Structural analysis of sand trap support structure
- Renewal methodology
|
2017-India |
Swing Platform Design Drawing and Analysis |
- Design and analysis of swing platforms
|
2017-India |
Engineering Analysis of All Windlass Foundation Renewal |
- Structural analysis of windlass foundation
- Renewal methodology
|
2017-India |
Sewage Tank Drawing and Design |
- Design and preparation of fabrication drawing for sewage tank
|
2017-India |
Column Shell Renewal Study |
- First principle analysis to renew the corroded part of column shell to meet ABS recommendation
|
2017-India |
Drawing and Analysis of Installation of AC Unit |
- Installation of AC unit to augment the existing AC system
- Preparation of structural and piping drawings
|
2017-India |
Drawing of Bomb Shelter at Drill Floor |
- Design of bomb shelters for drill floor
|
2017-India |
Tugger Base Design and Drawing |
- Design of base platform for tugger winches to assist handling of drill strand
|
2017-India |
Mooring Analysisar of Rig Actinia |
- Eight point mooring analysis of rig actinia at 35m water depth for operating and survival condition
|
2017-India |
Mooring Analysis of Bunker Tanker |
- Mooring analysis of bunker tanker to single buoy system
- Design of gravity anchors
|
2016-India |
Mooring Analysis |
- Mooring analysis of vessel “Kreuz Supporter” for operating and survival condition in Mumbai high oil field
- Catenary plots for understanding the vertical clearances from subsea pipelines
|
2016-India |
Mooring Analysis |
- Mooring analysis of vessel “Kreuz Supporter” for operating and survival condition in Tapti oil field
- Catenary plots for understanding the vertical clearances from subsea pipelines
|
2016-India |
Ugradation of Crane capacity |
- Under deck strengthening assessment for higher capacity, proposal of suitable additional strengthening
- Analysis of crane knuckle boom for higher capacity
|
2016-India |
Heavy Lift Analysis |
- Installation drawings for 150 t crane
- Structural assessment
- Stability assessment
|
2016-India |
DSV notation for Indian flag |
- Preparation of statutory layouts
- Preparation of system layouts
|
2016-India |
Installation of heating Coils |
- Preparation of system drawing
- Heat calculation
- Layout drawings
|
2015-India |
DP capability Plot |
- Preparation of Dp capability plot and thrust Utilisation curves
- Evaluation under operating and survival condition
|
2015-India Ongoing |
Peer Review of Mooring Analysis report. |
- Peer Review of Mooring Analysis report for accommodation barge.
- Review of Analysis methodology, system particulars, met-ocean data etc.
- Field layout review,
- Review of analysis results against design criteria (acceptance criteria) based on expertise and detailed mooring analysis (if required).
- Issue of recommendations.
|
2014 – India – Ongoing |
Design and Installation of lifting beams on Semi Submersible- Actinia |
- Preparation of Structural Drawing
- Structural Calculation
|
2014-India Ongoing |
Review of Baseline Platform Inspection Report (BPI) & Marine Growth Review (MGR) Report |
- Review of BPI-MGR report for recertification of jacket platform
- Review of previous certification recommendation and outstanding activities
- Review of periodic inspection, damages reported and remedial works completed
- Assessment of the condition of the Jacket structure with respect to the as-built data
- Issue of recommendations
|
2013 Abu Dhabi |
BUNDUQ HSE Management System Manual update |
- Assisting DNV for BUNDUQ’s HSE Management System Manual update
|
2013 Abu Dhabi |
OOCEP Corporate HSE Training Procedure |
- Assisting DNV for preparing OOCEP’s Corporate HSE Training Procedure
|
2013
Abu Dhabi |
BUNDUQ HSE Management System Manual update |
- Assisting DNV for BUNDUQ’s HSE Management System Manual update
|
2013
Abu Dhabi |
OOCEP Corporate HSE Training Procedure |
- Assisting DNV for preparing OOCEP’s Corporate HSE Training Procedure
|
2012-India |
Windload Analysis for CPC Zapata |
- Evaluation of windload and wind heeling moment on vessel and crane being carried piggy back
- Determin critical wind speed and direction to limit operations envelope
|
2012-Abu Dhabi / India |
GASCO ASAB – III, Phase – 3, EIA |
- Assisting DNV for ASAB – III, Phase – 3, Environmental Impacy Analysis (EIA) Study
|
2012-Abu Dhabi / India |
ADCO-TR Full Field Development HSEIA – Phase IV (Decommissioning & Demolition) Study |
- Assisting DNV for ADCO-TR Full Field Development Health, Safety & Environmental Impact Assessment (HSEIA) – Phase IV (Decommissioning & Demolition) Study
|
2012-Singapore |
Hydrodynamic Analysis for 88m PSV |
- Calculation of extreme sea motions at cranes and vessel CG points under sea conditions given by the owners
|
2012-Singapore |
Pre Bid Engineering Assistance for Martin Linge FSO for Hild Field |
- Engineering assistance for hull structure modification
- F.E.A. for hull structure
- Review of hull and marine system drawings
|
2012-India |
Pre Bid Engineering Assistance for Modification to ONGC Oil Rig |
- Engineering assistance for hull structure modification
- Review of hull and marine system drawings
|
2011- Singapore |
Modification to LNG Vessel Cargo Piping |
- Modification of Piping
- Design of New Production Manifold
- HAZOP Study for above modification
|
2011-Abu Dhabi |
ADGDC Drilling Safety Manual |
- Assisting DNV for ADGDC Drilling Safety Manual
|
2011-Abu Dhabi |
ZADCO Incident Reporting & Investigation Procedure |
- Assisting DNV for ZADCO Incident Reporting & Investigation Procedure
|
2011-Singapore |
Sea keeping and hydrodynamic analysis of offshore vessel |
- Calculation of extreme sea motions at cranes and vessel CG points under sea conditions given by the owners
|
2011-Singapore |
Gob Eye structure design |
- Finite element analysis of gob eye structure
|
2010-Oman |
Petroleum Development Oman (PDO) - Asset Integrity Process Safety Management Assessment |
- Assisting DNV for preparation of PDO Asset Integrity Process Safety Management Assessmentfor onshore drilling operations.
|
2010-Singapore |
Structural analysis for Cattle carrier generator installation |
- Finite element analysis
- Strength and vibration calculation
- Generator room design
|
2010-Singapore |
FPSO Marine Systems |
- Engineering and Drawing for De-commissioning FPSO systems.
|
2009-Singapore |
Helideck Design Analysis |
- Engineering and Structural Analysis for Helideck retrofit on an oil platform
|
2009-Singapore |
Fitment of Gondola, transducers and trolley and Moon Pool |
- Engineering and structural analysis for Fitment of Gondola, transducers, trolley and Moon Pool on board seismic survey vessel
|
2008-Singapore |
Global FEA for FPSO, Design of module Stool Supports and Crane Pedestal with Boom Rest |
Global 3-D Finite Element Analysis
- Dynamic loads
- Internal loads for cargo conditions
- Turret mooring reactions
- Turret loads on deck
Deflections and stresses for:
- Helideck
- Flare Tower
- Topside stools
- Coarse & Fine Mesh Modeling
- Crane Pedestal with Boom Rest
|
2007-Singapore |
Vibration Analysis for TG Foundation |
- Structural design of the Turbine Alternator Foundation
- Static analysis of the deck structure
- Evaluation the natural frequency of the engine room deck structure
- Vibration study and the foundation drawing
|
2007-Singapore |
Preliminary Mooring Analysis |
- 8 point spread moored system
- Dynamic spread moorings analysis according to class requirement including intact, damage and transient cases.
- Simulated load results.
- Mooring pattern
- Cantenary plot
- Motion envelopes
- Anchor type evaluations
|
2007-Singapore |
Hydrodynamic design for FSO |
- Green water analysis
- Slamming analysis
- Air gap analysis for external turret
|
2006-Singapore |
Upgrade design and systems engineering
(1 x FPSO 59,650 tdw) |
- Location analysis / spread mooring analysis
- Offloading analysis
- Hull analysis
- Evaluation of marine systems
|
2006-Singapore |
Steel renewal
(1 x FPSO 59,650 tdw) |
- Shipyard supervision of steel renewal
|
2006-Singapore / Malaysia |
Conversion of 1 x chemical tanker to FPSO |
- Complete preliminary design and engineering for bid process
- Hull evaluation for ultimate limit states
|
2006 - Singapore / Malaysia |
Conversion of 2 Panamax hulls to FPSOs |
- Complete preliminary design and engineering for bid process
- Hull evaluation for ultimate limit states
- Systems engineering and integration of process plant and topsides
- Preparation of tender documents for submission
|
2006-Singapore / Malaysia |
Conversion of Suezmax tanker to FPSO |
- Complete preliminary design and engineering for bid process
- Hull evaluation for ultimate limit states
- Systems engineering and integration of process plant and topsides
- Preparation of tender documents for submission to oil major.
|