Year / Location |
Project Type |
Project Details |
Nov-19 |
Design of mooring arrangement to meet New Panama Canal regulations of "Darya Kirthi", "Darya Jyoti", "Darya Moti" |
- Preparation of the plans for ACP approval
- Design of mooring arrangement
- Preparation of design drawings for Class submission
- BOM list to enable procurement of material
|
Sep-19 |
Mooring Fittings Upgrade for M.V. KUMIA SHAGANG |
- Mooring Fittings Upgrade for M.V. KUMIA SHAGANG as Per Pilbara Ports Authority (PPA)
- Updated General Arrangement drawing for PPA's Ship Towing
- Updated Mooring Arrangement drawing for PPA's Ship Towing
- Underdeck Stiffening drawings for New Mooring Fittings
- Bill of Material for underdeck Stiffening.
- Strength calculation of underdeck reinforcement for New Mooring Fitting
|
Jul-19 |
Design of mooring arrangement to meet New Panama Canal regulations of "Pacific East", "Pacific South", "Pacific West", "Pacific North" |
- Preparation of the plans for ACP approval
- Design of mooring arrangement
- Preparation of design drawings for Class submission
BOM list to enable procurement of material |
May-19 |
ASKO Self Propelled Auto Barge Basic Design |
- Basic Design Drawings of a self-propelled ASKO barge
|
Feb-19 |
Vessel Detailed Design – 3D modelling in Ship-Constructor |
- Vessel 3D Modelling in Ship-Constructor
|
2018-India – Ongoing |
Quarry- Pontoon Design |
- Design of dumb barge for pumping operation from quarry.
|
2018-India – Ongoing |
Design of mooring arrangement to meet New Panama Canal & Escravos requirement of "BW Odin" |
- Preparation of drawings as required for Panama Canal transit & to meet Escravos requirements and corresponding mooring modifications.
|
2018-India |
Panama Canal Modifications vessels "Petrel Arrow" & "Siskin Arrow" |
- Preparation of drawings as required for Panama Canal transit requirements and corresponding mooring modifications.
|
2018-India |
Spreader Bar Design |
- Design of spreader bar for lifting of machinery
|
2018-India |
Design of Cargo Support Beam |
- Design of support beam to carry the cargo on a barge.
|
2018-India |
Design and Analysis of under deck stiffening required for Mooring Fittings upgraded from 200 MT to 350T of "Nave Neutrino" & "Nave Celeste". |
- Design and Analysis as per class requirement.
- Preparation of structural drawings for Class submission.
- BOM list to enable procurement of material.
|
2018-India |
Design of mooring arrangement to meet New Panama Canal & Escravos requirement of "BW Tyr", "BW Thor" and "BW Lord". |
- Preparation of the plans for ACP approval
- Design of mooring arrangement
- Preparation of design drawings for Class submission
- BOM list to enable procurement of material
|
2018-India |
Design of mooring arrangement to meet New Panama Canal regulations of "MV Petrel Arrow" |
- Preparation of the plans for ACP approval
- Design of mooring arrangement
- Preparation of design drawings for Class submission
- BOM list to enable procurement of material
|
2018-India |
Mooring Fitting Upgrade for STS Operation of "Energy Orpheus" |
- Upgrade of mooring arrangement
- Preparation of design drawings for Class submission
- BOM list to enable procurement of material
|
2018-India |
Conversion of Closed Fairlead to Chock Type of "BW Empress" |
- Design of mooring arrangement
- Preparation of design drawings for Class submission
- BOM list to enable procurement of material
|
2017-India |
Detailed drawings for Passenger Ferry |
- 3D Modelling of the hull structure in Ship Constructor software for the generation of the production drawings.
|
2017-India -Ongoing |
Conceptual design of Passenger Boats, Shipyard Bid Evaluation, Drawing Appraisal, Techno Commercial Feasibility Study for the project and Newbuilding Site Supervision |
- Conceptual design of 100 pax & 50 pax Passenger Boats
- Shipyard Bid Evaluation
- Drawing Appraisal
- Techno Commercial Feasibility Study for the project
- Newbuilding Site Supervision
|
2017-India |
Design of mooring arrangement to meet New Panama Canal regulations of "MV Birch", "MV Pacific Dawn", "MV Ningbo Dawn", "MV Hisui" "MV Shanghai Dawn". |
- Preparation of the plans for ACP approval
- Design of mooring arrangement
- Preparation of design drawings for Class submission
- BOM list to enable procurement of material
|
2017-India |
Design of mooring arrangement to meet New Panama Canal regulations of "MV Raven Arrow" |
- Preparation of the plans for ACP approval
- Design of mooring arrangement
- Preparation of design drawings for Class submission
- BOM list to enable procurement of material
|
2017-India |
Design of mooring arrangement to meet New Panama Canal regulations of "MV TYR", |
- Design of mooring arrangement
- Preparation of design drawings for Class submission
- BOM list to enable procurement of material
|
2017-India |
Design of mooring arrangement to meet New Panama Canal regulations of "MV BW LOYALTY" |
- Design of mooring arrangement
- Preparation of design drawings for Class submission
- BOM list to enable procurement of material
|
2016 / India - Ongoing |
Detailed design of 6500 tons Oil Tanker |
- Preparation of production outputs like Nesting plan, fabrication drawing, bending templates, profile plots, material take off, part list, assemble sequence, NC code, spool drawings, penetration drawings, cable tray layout, etc. for shipyard to construct the vessel
|
2016-India |
Reduction of air draft |
- Modification to main mast
- Introduction of collapsible arrangement
|
2016-India |
Design of mooring arrangement to meet New Panama canal regulations of “MV Kodaijasan”, “MV Hanjin Matsuyama” and “MV Kumiai Shagang” |
- Design of mooring arrangement
- Preparation of design drawings for Class submission
- BOM list to enable procurement of material
|
2016-India |
Modification to Ships main Mast for Vessels MV RDO Concert and MV RDO Concord |
Design modification of main mast to accommodate Radar as follows;
- Main mast height reduction to 1.5 meters.
- Funnel height reduction.
- New S band radar post to be fitted in place of the old S band radar post.
- Port and Stbd NUC light post to be made tilting type
|
2015-India |
Relocation of Choke Manifold on WSV Ramya |
- Design of the extension of Man landing Platform.
- Design of the extension of the Hopper Platform.
- Design and analysis for the foundation of two 2000 gal N2 tank.
- FE & Fatigue analysis of the Man landing Platform.
- Onboard stability assessment for the vessel.
|
2015-India |
Installation of Karm fork & Towing pin on workboat |
- Addendum of towage and A – Frame operation to existing Stability Booklet for AMS SHINE & AMS SWISSCO
|
2015-India -Ongoing |
Detailed design/Production drawing preparation for 60 mtr LOA Seismic Support Vessel (SSV) under construction for Owners Tananger Offshore of Norway |
- Software used “ShipConstructor”
- Complete detailed assembly drawings for ;
- Hull Structure
- Piping
- Equipment layouts
- HVAC
- Electrical
- 3-D Model preparation detailing all of the above
|
2015-India |
Damage Stability Calaculation |
- Prepration of Damage Stability Booklet of Car Carrier
|
2014-India |
Draft Upgrade of Bulk Carrier |
- Preparation of Probablistic Damage Stability Booklet
- Preparation of Draft Mark Drawing
|
2014-India Ongoing |
Design Of Life Raft Cradle |
- Shifting of Life raft from its existing position to New position as per SOLAS requirement
- Preparation of detailed drawing for foundation of life raft
- Preparation of updated LSA plan
- Preparation of updated General Arrangement
|
2014-India Ongoing |
Installation of Magnuss Vertically Variable Ocean Sail System (VOSS) into bulk carrier |
Electrical Design
- Electrical / electronic schematic
- Detailed Schematic drawings for Fail Safe working of VOSS
- Detailed Parts List Preparation
- Terminal Charts with Cable Layouts for Installation of VOSS in a Panamax Bulker
- Flowchart showing high level logic
Structural Work
- Feasibility study for the installation
- Three Hold Finite Element Model of vessel prepared on the basis of Common Structural Rules (CSR) for Bulk Carrier in ANSYS.
- Voss Silo Finite Element Model Prepared in Ansys.
- Integration between Voss Silo FE Model and Ship Hold FE Model
- Liaise with the LR class for the approval
|
2014-India Ongoing |
NDS – 60 SSV Seismic Supply Vessel |
- Concept studies
- Initial design
- Complete FEED engineering
- Preparation of production design
|
2014-India |
Sludge Handling vessel |
- Design Drawing Appraisal for Electrical drawings.
|
2014-China – Ongoing |
New Castle max 206k bulk carrier |
- Design Drawing Appraisal for Hull, Machinery, Piping and Electrical drawings.
|
2014-China – Ongoing |
Design Drawing Appraisal for 82k bulk carrier |
- Design Drawing Appraisal for Hull, Machinery, Piping and Electrical drawings.
|
2014- India |
Design of Self Elevating Modular Platform |
- Design of Self Elevating Modular Platform for survey operation in coastal waters
- Structural Design of Hull
- Stability Assessment
- Leg Design
- Coupling Design
|
2014- India |
Design of Gangway |
- Design and Drawing of Gangway for Offshore Platform
- Finite element analysis of the Gangway
|
2013-India |
Reasearch towards rule Development |
- Research towards rule development for FPSO units covering following topics:
- Class Notations
- Survey Requirement
- System Requirement
- Design Requirement
- Conversion Requirement
- Rule Writing
- Comparison of Various Rules
|
2013-India - Ongoing |
Design Drawing Appraisal for Bulk Carrier |
- Design Drawing Appraisal for Hull, Machinery, Piping and Electrical drawings.
|
2013-India - Ongoing |
Design Drawing Appraisal for Bulk Carrier |
- Design Drawing Appraisal for Hull, Machinery, piping and Electrical drawings.
|
2013 |
INS |
|
2013 |
INS |
|
2013-India |
INS Sujata |
- Inclining experiment and stability calculations
|
2013-India |
Plan Approval for Bulk Carrier
(28029 MT) |
- Modification & Preparation of FCP and LSA Plans
|
2013-India |
50 m Twin Hull
Battle Practise target |
- Hull form and calculations
- Basic Design
|
2013-India |
2200 TEU Container Ship |
- Converting Void tank to Sewage Retention tank
|
2013-India |
Vestfonn – Well Stimulation Vessel |
- Installation of separator
- Layout of Aft deck area
- Deck Strength calculations
- Blast calculations
|
2013-Rwanda |
Detailed design of
- Aluminum ferry
- Self propelled barge
- Flat top dumb barge
- Pusher tugs
|
- Conceptional design
- Basic design
- Detailed design
- Preparation of tender docs for the designed vessels
|
2012-Australia |
Calculation of stability of AHTS for safe carriage of cargo |
- Calculation of stability parameters (Equipment weights & distribution, GM and GZ curve)
- Recommendations on maximum cargo carriage and distribution
|
2012-India |
Modification of PSV “Ramya & Yamuna” for carriage of Well Stim System |
- Sea fastening calculations
- Revised stability calculations
- Skid securing design
|
2012-India |
Loading of Heavy Lift Cargo on to a barge |
- Sea fastening calculations
- Preparation of stowage and lashing plan
|
2012-India |
INS Sujata – Inclining Experiment |
- Performing inclining experiment.
- Preparation of report for inclining experiment.
- Monitoring and in charge of inclining experiment of Indian Navy’s Cadet training ship INS Sujata
|
2012-India |
WISL / Indian Navy Fuel Barges |
- Concept, design & preparation of design philosophy document for Fuel Barges
|
2012-India |
BWMP for vessel Stanford Hobby |
- Preparation of Ballast Water Management Plan.
|
2012-Singapore |
Concept GA preparation for Geotechnical Research vessel |
- Preparation of Concept General Arrangement of Geotechnical Research Vessel (LOA- 55.20 m,Breadth -13.50 m,Depth- 6.25m )
- Equipment Number Calculations for the determination of mooring equipments for the Geotechnical Research Vessel
- Preparation of Concept General Arrangement of Supply Vessel (LOA- 94.65 m, Breadth- 22.00 m, Depth- 9.20m)
|
2012-India |
WSV Vestfonn – Emergency Towing booklet |
- Preparation of Emergency Towing Booklet
|
2011-India |
Cargo Loading on barge |
- Sea fastening calculations
- Preparation of stowage and lashing plan
|
2011- Singapore |
Mooring Force Calculations |
- Mooring Force Calculations for LNG Vessel berthing at LNG Terminal
|
2011- Singapore |
Finite Element Analysis and modification to pontoon crane 30T SWL Pedestal for Veer Avaneesh |
- Finite Element Analysis of Crane Pedestal
- Identification of high stress areas & mitigation of stresses
- Modification to Pedestal Design
|
2011-India |
Design of steel luxury yacht |
- Conceptual design
- Design computations
- Basic design
- Detail Design
|
2011-Singapore / India |
Plan Approval for Bulk Carrier |
- Plan approval for Hull, Machinery, piping and Electrical drawings.
|
2011-India |
Preparation of LSA, LSS & FCP Drawings & acc plans for 2 vessels |
- Preparation of LSA, LSS & FCP Drawings & acc plans for 2 vessels
|
2011-India |
Stability calculations - chemical tanker post conversion |
- Preparation of hydrostatic model
- Intact and damage stability calculations
- Submission for Class
|
2011-India |
Emergency Towing Booklet |
- Preparation of Emergency Towing Booklet
|
2011-India |
Damage Control Booklet & Damage Control Plan |
- Preparation of Damage Control Booklet & Damage Control Plan
|
2011-India |
STP foundation & grey water system drawing for Naval vessel. |
- Design and preparation of drawing for STP Plant.
- Complete design of Grey water system.
|
2011-India |
Gob eye Design & Deck strengthening (45 T) |
- Design and preparation of drawing for 45 T Gob eye and under deck stiffening.
|
2011-Singapore |
Plan approval for 32K Dwt bulk carrier at China |
- Plan approval for Hull, Machinery, piping and Electrical drawings.
|
2011-Singapore |
Plan approval for 82K Dwt Kamsarmax bulk carrier |
- Plan approval for Hull, Machinery, piping and Electrical drawings.
|
2011-India |
WISL / Indian Navy Battle practice target |
- Concept design & preparation design philosophy Document for a Catamaran Battle practice target.
|
2010-2011 – India |
Preparation of Plans |
- Preparation of LSA, LSS & FCP Plans, Accommodation plans & Stability Booklet for 10 Dredger vessels
|
2010-India |
Modifications to vessel bunker tanks |
- Conversion of existing fuel oil tank to two diesel oil tanks
|
2010-India |
Technical Contract for 4 Capesize Bulk Carriers |
- Technical specification review of four [Chinese/Korean] shipyards;
- Equipment makers list review for the same shipyards.
- Technical negotiations in India/Abroad with the same shipyards.
- Provide RNRL a consolidated comparison-sheet of the specifications provided by the four shipyards
|
2010-Singapore / India |
Plan Approval for PSV |
- Plan approval for Hull, Machinery, Piping and Electrical drawings.
|
2010-India |
WISL/Indian Navy Berthing Pontoons |
- Concept design & preparation Design Philosophy Document for a catamaran pontoon.
|
2010-India |
Vessel Steel Replacement Analysis |
- Calculation of quantum of steel to be replace
- Analysis of vessel’s sag
|
2010-India |
Material Handling System upgrade - Phase 3 (69,000 tdw transshipment vessel) |
- Prepare procedures for de-commissioning of existing crane and installation of new crane
- Prepare design calculations and stowage plans for crane jibs
- Co-ordination of work to be carried out by crane suppliers, shipyard and class
- Supervision for installation of cranes in shipyard
- Assistance in hooking up crane system
|
2009-India |
Vessel Conversion – Fishing vessel to Oceanographic Research vessel. |
- Conversion, Design and Engineering
- Machinery and Electrical layouts
- Machinery system schematics
- Regulatory compliance checks
- Deck strengthening calculations
- Foundation drawings
- Electrical schematics
|
2009-India |
Preparation of Ships Manuals |
|
2008-India |
GRT/NRT |
- Tonnage computation for 3 tugs.
|
2007-Singapore |
Submersible Barge Launch |
Jacket Barge
- Barge lengthening structural drawings
- Rocker arm drawings and calculation
- Stability calculation / Longitudinal strength calculation
- FEM analysis for barge structure
Submersible Barge
- Design of tanks on upper deck
- Stability calculation for submerging operation
- Repositioning of Generator room
- Repositioning of Pump room.
|
2007-Singapore |
Container carrier to General Cargo vessel |
- Equipment specifications
- Basic design including lines generation
- Cargo hold strength analysis
- Section modulus calculations
|
2006-India |
Material Handling System upgrade - Phase 3 (69,000 tdw transshipment vessel) |
- Prepare procedures for de-commissioning of existing crane and installation of new crane
- Prepare design calculations and stowage plans for crane jibs
- Co-ordination of work to be carried out by crane suppliers, shipyard and class
- Supervision for installation of cranes in shipyard
- Assistance in hooking up crane system
|
2006-Singapore |
Upgrade design for VLCC |
- Design and drawing of piping modification
|
2005-Singapore |
Design evaluation (2 x 1,030 TEU Container Vessels) |
- Technical Specifications Review
- Contract Review
- Drawings Appraisal and Design Review
|
2005-India |
Detailed condition assessment and life extension study for 7,412 tdw multipurpose container vessel |
- Detailed condition assessment, fatigue analysis
- Hull
- Cargo Handling systems
- Propulsion
- Life extension evaluation for 5 years
- Costs and proposals for upgrade / maintainability and /or replacement
|
2004-2005-India |
Detailed condition assessment and life extension study for 69,000 tdw transshipment vessel |
- Detailed condition assessment, vibration analysis, fatigue analysis
- Hull
- Material Handling systems
- Propulsion Life extension evaluation for 15 years
- Costs and proposals for upgrade / maintainability and /or replacement.
|
2004-2005 China |
Vessel conversion and service engineering (145,000 tdw bulker to transshipment vessel) |
- Design and Engineering for Material and ship systems.
- Service engineering after deployment
|