You are here : Home    project    Design and Engineering

Design and Engineering

 

Year / Location

Project Type

Project Details

Nov-19 Design of mooring arrangement to meet New Panama Canal regulations of "Darya Kirthi", "Darya Jyoti", "Darya Moti"
  • Preparation of the plans for ACP approval
  • Design of mooring arrangement
  • Preparation of design drawings for Class submission
  • BOM list to enable procurement of material
Sep-19 Mooring Fittings Upgrade for M.V. KUMIA SHAGANG
  • Mooring Fittings Upgrade for M.V. KUMIA SHAGANG as Per Pilbara Ports Authority (PPA)
  • Updated General Arrangement drawing for PPA's Ship Towing
  • Updated Mooring Arrangement drawing for PPA's Ship Towing
  • Underdeck Stiffening drawings for New Mooring Fittings
  • Bill of Material for underdeck Stiffening.
  • Strength calculation of underdeck reinforcement for New Mooring Fitting
Jul-19 Design of mooring arrangement to meet New Panama Canal regulations of "Pacific East", "Pacific South", "Pacific West", "Pacific North"
  • Preparation of the plans for ACP approval
  • Design of mooring arrangement
  • Preparation of design drawings for Class submission
BOM list to enable procurement of material
May-19 ASKO Self Propelled Auto Barge Basic Design
  • Basic Design Drawings of a self-propelled ASKO barge
Feb-19 Vessel Detailed Design – 3D modelling in Ship-Constructor
  • Vessel 3D Modelling in Ship-Constructor
2018-India – Ongoing Quarry- Pontoon Design
  • Design of dumb barge for pumping operation from quarry.
2018-India – Ongoing Design of mooring arrangement to meet New Panama Canal & Escravos requirement of "BW Odin"
  • Preparation of drawings as required for Panama Canal transit & to meet Escravos requirements and corresponding mooring modifications.
2018-India Panama Canal Modifications vessels "Petrel Arrow" & "Siskin Arrow"
  • Preparation of drawings as required for Panama Canal transit requirements and corresponding mooring modifications.
2018-India Spreader Bar Design
  • Design of spreader bar for lifting of machinery
2018-India Design of Cargo Support Beam
  • Design of support beam to carry the cargo on a barge.
2018-India Design and Analysis of under deck stiffening required for Mooring Fittings upgraded from 200 MT to 350T of "Nave Neutrino" & "Nave Celeste".
  • Design and Analysis as per class requirement.
  • Preparation of structural drawings for Class submission.
  • BOM list to enable procurement of material.
2018-India Design of mooring arrangement to meet New Panama Canal & Escravos requirement of "BW Tyr", "BW Thor" and "BW Lord".
  • Preparation of the plans for ACP approval
  • Design of mooring arrangement
  • Preparation of design drawings for Class submission
  • BOM list to enable procurement of material
2018-India Design of mooring arrangement to meet New Panama Canal regulations of "MV Petrel Arrow"
  • Preparation of the plans for ACP approval
  • Design of mooring arrangement
  • Preparation of design drawings for Class submission
  • BOM list to enable procurement of material
2018-India Mooring Fitting Upgrade for STS Operation of "Energy Orpheus"
  • Upgrade of mooring arrangement
  • Preparation of design drawings for Class submission
  • BOM list to enable procurement of material
2018-India Conversion of Closed Fairlead to Chock Type  of "BW Empress"
  • Design of mooring arrangement
  • Preparation of design drawings for Class submission
  • BOM list to enable procurement of material
2017-India Detailed drawings for Passenger Ferry
  • 3D Modelling of the hull structure in Ship Constructor software for the generation of the production drawings.
2017-India -Ongoing Conceptual design of Passenger Boats, Shipyard Bid Evaluation, Drawing Appraisal, Techno Commercial Feasibility Study for the project and Newbuilding Site Supervision
  • Conceptual design of 100 pax & 50 pax Passenger Boats
  • Shipyard Bid Evaluation
  • Drawing Appraisal
  • Techno Commercial Feasibility Study for the project
  • Newbuilding Site Supervision
2017-India Design of mooring arrangement to meet New Panama Canal regulations of "MV Birch", "MV Pacific Dawn", "MV Ningbo Dawn", "MV Hisui" "MV Shanghai Dawn".
  • Preparation of the plans for ACP approval
  • Design of mooring arrangement
  • Preparation of design drawings for Class submission
  • BOM list to enable procurement of material
2017-India Design of mooring arrangement to meet New Panama Canal regulations of "MV Raven Arrow"
  • Preparation of the plans for ACP approval
  • Design of mooring arrangement
  • Preparation of design drawings for Class submission
  • BOM list to enable procurement of material
2017-India Design of mooring arrangement to meet New Panama Canal regulations of "MV TYR",
  • Design of mooring arrangement
  • Preparation of design drawings for Class submission
  • BOM list to enable procurement of material
2017-India Design of mooring arrangement to meet New Panama Canal regulations of "MV BW LOYALTY"
  • Design of mooring arrangement
  • Preparation of design drawings for Class submission
  • BOM list to enable procurement of material
2016 / India - Ongoing Detailed design of 6500 tons Oil Tanker
  • Preparation of production outputs like Nesting plan, fabrication drawing, bending templates, profile plots, material take off, part list, assemble sequence, NC code, spool drawings, penetration drawings, cable tray layout, etc. for shipyard to construct the vessel

2016-India

Reduction of air draft
  • Modification to main mast
  • Introduction of collapsible arrangement

2016-India

Design of mooring arrangement to meet New Panama canal regulations of “MV Kodaijasan”, “MV Hanjin Matsuyama” and “MV Kumiai Shagang”
  • Design of mooring arrangement
  • Preparation of design drawings for Class submission
  • BOM list to enable procurement of material

2016-India

Modification to Ships main Mast for Vessels MV RDO Concert and MV RDO Concord Design modification of main mast to accommodate Radar as follows;
  • Main mast height reduction to 1.5 meters.
  • Funnel height reduction.
  • New S band radar post to be fitted in place of the old S band radar post.
  • Port and Stbd NUC light post to be made tilting type

2015-India

Relocation of Choke Manifold on WSV Ramya
  • Design of the extension of Man landing Platform.
  • Design of the extension of the Hopper Platform.
  • Design and analysis for the foundation of two 2000 gal N2 tank.
  • FE & Fatigue analysis of the Man landing Platform.
  • Onboard stability assessment for the vessel.

2015-India

Installation of Karm fork & Towing pin on workboat
  • Addendum of towage and A – Frame operation to existing Stability Booklet for AMS SHINE & AMS SWISSCO

2015-India -Ongoing

Detailed design/Production drawing preparation for 60 mtr LOA Seismic Support Vessel (SSV) under construction for Owners Tananger Offshore of Norway
  • Software used “ShipConstructor”
  • Complete detailed assembly drawings for ;
  • Hull Structure
  • Piping
  • Equipment layouts
  • HVAC
  • Electrical
  • 3-D Model preparation detailing all of the above

2015-India

Damage Stability Calaculation

  • Prepration of Damage Stability Booklet of Car Carrier

2014-India

Draft Upgrade of Bulk Carrier

  • Preparation of Probablistic Damage Stability Booklet
  • Preparation of Draft Mark Drawing

2014-India Ongoing

Design Of Life Raft Cradle

  • Shifting of Life raft from its existing position to New position as per SOLAS requirement
  • Preparation of detailed drawing for foundation of life raft
  • Preparation of updated LSA plan
  • Preparation of updated General Arrangement

2014-India Ongoing

Installation of Magnuss Vertically Variable Ocean Sail System (VOSS) into bulk carrier

Electrical Design

  • Electrical / electronic schematic
  • Detailed Schematic drawings for Fail Safe working of VOSS
  • Detailed Parts List Preparation
  • Terminal Charts with Cable Layouts for Installation of VOSS in a Panamax Bulker
  • Flowchart showing high level logic

Structural Work

  • Feasibility study for the installation
  • Three Hold Finite Element Model of vessel prepared on the basis of Common Structural Rules (CSR) for Bulk Carrier in ANSYS.
  • Voss Silo Finite Element Model Prepared in Ansys.
  • Integration between Voss Silo FE Model and Ship Hold FE Model
  • Liaise with the LR class for the approval

2014-India Ongoing

NDS – 60 SSV Seismic Supply Vessel

  • Concept studies
  • Initial design
  • Complete FEED engineering
  • Preparation of production design

2014-India

Sludge Handling vessel

  • Design Drawing Appraisal for Electrical drawings.

2014-China – Ongoing

New Castle max 206k bulk carrier

  • Design Drawing Appraisal for Hull, Machinery, Piping and Electrical drawings.

2014-China – Ongoing

Design Drawing Appraisal for 82k bulk carrier

  • Design Drawing Appraisal for Hull, Machinery, Piping and Electrical drawings.

2014- India

Design of Self Elevating Modular Platform

  • Design of Self Elevating Modular Platform for survey operation in coastal waters
  • Structural Design of Hull
  • Stability Assessment
  • Leg Design
  • Coupling Design

2014- India

Design of Gangway

  • Design and Drawing of Gangway for Offshore Platform
  • Finite element analysis of the Gangway

2013-India

Reasearch towards rule Development

  • Research towards rule development for FPSO units covering following topics:
    • Class Notations
    • Survey Requirement
    • System Requirement
    • Design Requirement
    • Conversion Requirement
  • Rule Writing
  • Comparison of Various Rules

2013-India - Ongoing

Design Drawing Appraisal for Bulk Carrier

  • Design Drawing Appraisal for Hull, Machinery, Piping and Electrical drawings.

2013-India - Ongoing

Design Drawing Appraisal for Bulk Carrier

  • Design Drawing Appraisal for Hull, Machinery, piping and Electrical drawings.

2013

INS

2013

INS

2013-India

INS Sujata

  • Inclining experiment and stability calculations

2013-India

Plan Approval for Bulk Carrier
(28029 MT)

  • Modification & Preparation of  FCP and LSA Plans

2013-India

50 m Twin Hull
Battle Practise target

  • Hull form and calculations
  • Basic Design

2013-India

2200 TEU Container Ship

  • Converting Void tank to Sewage Retention tank

2013-India

Vestfonn – Well Stimulation Vessel

  • Installation of separator
  • Layout of Aft deck area
  • Deck Strength calculations
  • Blast calculations

2013-Rwanda

Detailed design of

  • Aluminum ferry
  • Self propelled barge
  • Flat top dumb barge
  • Pusher tugs
  • Conceptional design
  • Basic design
  • Detailed design
  • Preparation of tender docs for the designed vessels

2012-Australia

Calculation of stability of AHTS for safe carriage of cargo

  • Calculation of stability parameters (Equipment weights & distribution, GM and GZ curve)
  • Recommendations on maximum cargo carriage and distribution

2012-India

Modification of PSV “Ramya & Yamuna” for carriage of Well Stim System

  • Sea fastening calculations
  • Revised stability calculations
  • Skid securing design

2012-India

Loading of Heavy Lift Cargo on to a barge

  • Sea fastening calculations
  • Preparation of stowage and lashing plan

2012-India

INS Sujata – Inclining Experiment

  • Performing inclining experiment.
  • Preparation of report for inclining experiment.
  • Monitoring and in charge of inclining experiment of Indian Navy’s Cadet training ship INS Sujata

2012-India

WISL / Indian Navy Fuel Barges

  • Concept, design & preparation of design philosophy document for Fuel Barges

2012-India

BWMP for vessel Stanford Hobby

  • Preparation of Ballast Water Management Plan.

2012-Singapore

Concept GA preparation for Geotechnical Research vessel

  • Preparation of Concept General Arrangement of Geotechnical Research Vessel (LOA- 55.20 m,Breadth -13.50 m,Depth- 6.25m )
  • Equipment Number Calculations for the determination of mooring equipments for the Geotechnical Research Vessel
  • Preparation of Concept General Arrangement of Supply Vessel (LOA- 94.65 m, Breadth- 22.00 m, Depth- 9.20m)

2012-India

WSV Vestfonn – Emergency Towing booklet

  • Preparation of Emergency Towing Booklet

2011-India

Cargo Loading on barge

  • Sea fastening calculations
  • Preparation of stowage and lashing plan

2011- Singapore

Mooring Force Calculations

  • Mooring Force Calculations for LNG Vessel berthing at LNG Terminal

2011- Singapore

Finite Element Analysis and modification to pontoon crane 30T SWL Pedestal for Veer Avaneesh

  • Finite Element Analysis of Crane Pedestal
  • Identification of high stress areas & mitigation of stresses
  • Modification to Pedestal Design

2011-India

Design of steel luxury yacht

  • Conceptual design
  • Design computations
  • Basic design
  • Detail Design

2011-Singapore / India

Plan Approval for Bulk Carrier

  • Plan approval for Hull, Machinery, piping and Electrical drawings.

2011-India

Preparation of LSA, LSS & FCP Drawings & acc plans for 2 vessels

  • Preparation of LSA, LSS & FCP Drawings & acc plans for 2 vessels

2011-India

Stability calculations -  chemical tanker post conversion

  • Preparation of hydrostatic model
  • Intact and damage stability calculations
  • Submission for Class

2011-India

Emergency Towing Booklet

  • Preparation of Emergency Towing Booklet

2011-India

Damage Control Booklet & Damage Control Plan

  • Preparation of Damage Control Booklet & Damage Control Plan

2011-India

STP foundation & grey water system drawing for Naval vessel.

  • Design and preparation of drawing for STP Plant.
  • Complete design of Grey water system.

2011-India

Gob eye Design & Deck strengthening  (45 T)

  • Design and preparation of drawing for 45 T Gob eye and under deck stiffening.

2011-Singapore

Plan approval for 32K Dwt  bulk carrier at China

  • Plan approval for Hull, Machinery, piping and Electrical drawings.

2011-Singapore

Plan approval for 82K Dwt Kamsarmax bulk carrier

  • Plan approval for Hull, Machinery, piping and Electrical drawings.

2011-India

WISL / Indian Navy Battle practice target

  • Concept design & preparation design philosophy Document for a Catamaran Battle practice target.

2010-2011 – India

Preparation of Plans

  • Preparation of LSA, LSS & FCP Plans, Accommodation plans & Stability Booklet for 10 Dredger vessels

2010-India

Modifications to vessel bunker tanks

  • Conversion of existing fuel oil tank to two diesel oil tanks

2010-India

Technical Contract for 4 Capesize Bulk Carriers

  • Technical specification review of four [Chinese/Korean] shipyards;
  • Equipment makers list review for the same shipyards.
  • Technical negotiations in India/Abroad with the same shipyards.
  • Provide RNRL a consolidated comparison-sheet of the specifications provided by the four shipyards 

2010-Singapore / India

Plan Approval for PSV

  • Plan approval for Hull, Machinery, Piping and Electrical drawings.

2010-India

WISL/Indian Navy Berthing Pontoons

  • Concept design & preparation Design Philosophy Document for a catamaran pontoon.

2010-India

Vessel Steel Replacement Analysis

  • Calculation of quantum of steel to be replace
  • Analysis of vessel’s sag

2010-India

Material Handling System upgrade -  Phase 3 (69,000 tdw transshipment vessel)

  • Prepare procedures for de-commissioning of existing crane and installation of new crane
  • Prepare design calculations and stowage plans for crane jibs
  • Co-ordination of work to be carried out by crane suppliers, shipyard and class
  • Supervision for installation of cranes in shipyard
  • Assistance in hooking up  crane system

2009-India

Vessel Conversion – Fishing vessel to Oceanographic Research vessel.

  • Conversion, Design and Engineering 
  • Machinery and Electrical layouts
  • Machinery system schematics
  • Regulatory compliance checks
  • Deck strengthening calculations
  • Foundation drawings
  • Electrical schematics

2009-India

Preparation of Ships Manuals

  • BWMP, SOPEP & SMPEP

2008-India

GRT/NRT

  • Tonnage computation for 3 tugs.

2007-Singapore

Submersible Barge Launch

Jacket Barge

  • Barge lengthening structural drawings
  • Rocker arm drawings and calculation
  • Stability calculation / Longitudinal strength calculation
  • FEM analysis for barge structure

Submersible Barge

  • Design of tanks on upper deck
  • Stability calculation for submerging operation
  • Repositioning of Generator room
  • Repositioning of Pump room.

2007-Singapore

Container carrier to General Cargo vessel

  • Equipment specifications
  • Basic design including lines generation
  • Cargo hold strength analysis
  • Section modulus calculations

2006-India

Material Handling System upgrade -  Phase 3 (69,000 tdw transshipment vessel)

  • Prepare procedures for de-commissioning of existing crane and installation of new crane
  • Prepare design calculations and stowage plans for crane jibs
  • Co-ordination of work to be carried out by crane suppliers, shipyard and class
  • Supervision for installation of cranes in shipyard
  • Assistance in hooking up  crane system

2006-Singapore

Upgrade design for VLCC

  • Design and drawing of piping modification

2005-Singapore

Design evaluation (2 x 1,030 TEU Container Vessels)

  • Technical Specifications Review
  • Contract Review
  • Drawings Appraisal and Design Review

2005-India

Detailed condition assessment and life extension study for 7,412 tdw multipurpose container vessel

  • Detailed condition assessment, fatigue analysis
  • Hull
  • Cargo Handling systems
  • Propulsion
  • Life extension evaluation for 5 years
  • Costs and proposals for upgrade / maintainability and /or replacement

2004-2005-India

Detailed condition assessment and life extension study for 69,000 tdw transshipment vessel

  • Detailed condition assessment, vibration analysis, fatigue analysis
  • Hull
  • Material Handling systems
  • Propulsion Life extension evaluation for 15 years
  • Costs and proposals for upgrade / maintainability and /or replacement.

2004-2005 China

Vessel conversion and service engineering (145,000 tdw bulker to transshipment vessel)

  • Design and Engineering for Material and ship systems.
  • Service engineering after deployment